City of Vernon California

Metro Link Union Station Project

Metro's Link Union Station (Link US) Project may have an impact on Vernon. Below, find out how you may learn more about the details of the project, and how you may provide your feedback on Metro's proposed plan.

Background
On September 18, 2020, a Revised Notice of Intent (NOI) for the preparation of an Environmental Impact Statement (EIS) for the Link US Project was published. Since the Federal Railroad Administration (FRA) published the original NOI in 2016, the California High-Speed Rail Authority (CHSRA) and Metro have identified new off-site adjustments to the BNSF Malabar Yard in the City of Vernon. Because of the loss of storage track capacity anticipated by BNSF at their yard in proximity to Union Station, Metro is proposing the Malabar Yard as a site to restore storage track capacity for BNSF. The intent of the Revised NOI is to solicit additional public and agency input into the development of the scope of the Link US Project EIS with respect to the BNSF Malabar Yard adjustments proposed in the City of Vernon.

Revised Notice of Intent to Prepare an Environmental Impact Statement for the Link Union Station Project:
https://www.federalregister.gov/documents/2020/09/17/2020-20520/revised-notice-of-intent-to-prepare-an-environmental-impact-statement-for-the-link-union-station

The Revised NOI 30-day public comment period started on September 18, 2020 and ends on October 19, 2020. Additionally, Metro will host a virtual public scoping meeting on Thursday, October 8, 2020, from 6:00pm – 8:00pm, and will accept verbal and digital public comments during the meeting.

Virtual Open House
To allow the public to learn more about the Link US Project, Metro has scheduled a virtual open house at www.LinkUnionStation.com which will be made available throughout the public comment period. In the virtual open house, participants will have an opportunity to learn more about the following topics:

Proposed adjustments to the BNSF Malabar Yard in the City of Vernon
Link US funding and phasing
Major project components
Alternatives being considered

Virtual Public Scoping Meeting
A virtual public scoping meeting will be held during the 30-day public comment period:

Date: Thursday, October 8, 2020
Time: 6-8pm
Live Presentation: 6-6:30pm
Public Comments: 6:30pm-8pm (verbal and digital)
Weblink: www.LinkUnionStation.com 

Call-in Number: 669.900.9128
Web Link: https://bit.ly/33aUWj6 
Webinar ID: 824 7060 0907
Passcode: 454631

ADA accommodations and translations are available by calling 213.922.2524 or California Relay Service at 711 at least 72 hours in advance of the virtual public scoping meeting.

How to submit comments on the Revised NOI:
Comments can be submitted to the CHSRA or Metro during the 30-day public comment period (September 18, 2020 through October 19, 2020) in support of the National Environmental Policy Act (NEPA) environmental review process via one of the following ways:

  • Comment form provided at the comment station in the Virtual Open House
  • Email to: This email address is being protected from spambots. You need JavaScript enabled to view it.  
  • Project information line: 213.922.2524
  • Written to either of the following:

  • Mark A. McLoughlin, Director California High-Speed

Rail Authority, Environmental Services Branch 770 L Street, Suite 620, Sacramento, CA 95814| This email address is being protected from spambots. You need JavaScript enabled to view it.

  • Vincent Chio, Director of Program Management Los Angeles County Metropolitan Transportation Authority, Regional Rail One Gateway Plaza (Mail Stop 99-17-2), Los Angeles, CA 90012 This email address is being protected from spambots. You need JavaScript enabled to view it.  

 


All public comments should be submitted by October 19, 2020 at 5pm.

Stay Updated!
213.922.2524
This email address is being protected from spambots. You need JavaScript enabled to view it.  
metro.net/link-us
facebook.com/regionalrail 
facebook.com/losangelesmetro